|
Drilling
Activity
|
 |
|
- QCCO Drilling personnel have all aspects and problems
related to hole drilling, such as: |
-
Drill string design & safe pull
- Deviation control
- Hydraulics
- Drilling fluid & conditioning equipment
- Drilling Calculations
- Surface hole
|
|
| -
QCCO personnel have a well knowledge of the types of mud pumps
like: |
-
Mud pump parts
- Output volumes
- Power and efficiency
- Accumulator parts
- Types and factors affecting accumulator sizing and
choice
- Pressures related to mud pumps and accumulators
|
|
| -
QCCO personnel are aware of the Units & areas: |
-
Volumes, displacement & weight of tubular
- Capacities & densities
- Hook loads and string weights
- Buoyancy
- Introduction to hole and formation pressures
- Slug Calculations
|
|
| -
QCCO personnel have the experience in the properties of fluids |
-
Hydraulic Principals
- Pressure of liquid
- Geer pumps
- Piston pump
- Directional control valves
- Pressure control valves
- Servo valve
|
|
|
|
|
| All
QCCO personnel have a current offshore survival certificate
and valid IWCF certificate. They have attended the Induction
Safety Course, Safety & H2Scourse, Electrical Safety,
Fire fighting & First aid course. |
|
| Brief
experience details are as follows: |
-
Drilling Activities: Drilling Operation, Mud Line Suspension,
Horizontal Drilling, Drilling Fluids & Cement &
Cem. Op. Design/Operat.,
- Well drilling experience Completion Activities: Completion
activity and work over operation, Well Testing (Oil),
Well Testing (Gas), Gravel Pack, Dual Completion, Perforating
Technique,.
- Completion& WO experience Advanced Drilling: Lean
Profile, Under balance Drilling, Coil Tubing Drilling
Advanced.
- Intelligent Completions High Profile Drilling: Extended
Reach Drilling, Hp/Ht Drilling, Simultaneous Drilling,
Rig Construction / Upgrading, Well bore Stability/Sand
Production/Prediction & Control High Profile Completion.
- WO-Rig less: Well Stimulation (Acid), Well Stimulation
(Frac), Stimul./Compl./Gravel Pack/Fractal.
- Jobs Fluids Design & Eng., Hp/Ht Completion, Simultaneous
Production, Well bore Stability/Sand Production/Prediction
& Control"
|
|
| |